When To Open Uskudar-Cekmekoy Metro

Uskudar Cekmekoy Metro was recounted. Uskudar Cekmekoy metro, which is of great importance in order to ease the traffic of the Anatolian side and make transportation easier, has come to an end. When will millions of people living near Anatolia wait for curiosity and Uskudar Cekmekoy subway will be opened?

Uskudar Citizens waiting for the opening of the Cekmekoy subway continue to investigate the history of the project. Uskudar Cekmekoy metro, covering a total area of ​​82 km, will be opened for use by 5 million passengers. When will Pek, uskudar cekmekoy subway be opened?

istanbul-cekmekoy-metro.jpg

Uskudar Cekmekoy Metro, which has a total length of 20 kilometers and is planned to be extended to Sabiha Gokcen and Sultanbeyli in future periods, passes through 16 stations.

21 units of 126 wagons with 6 rows will serve.

A maximum of 1620 passengers can be carried in each row.

The maximum passenger capacity will be 64,800 passengers / hour / direction per hour.

The maximum speed of the train will be 80km / hour.

The average travel time between the first station and the last station will be 24 minutes.

The stopping time on the stations will be 20 seconds.

One flight will be arranged in 90 seconds.

Announced that the trial flights on the Metro Line will begin in January. In the meantime, between the uskudar and cekmekoy, the railway will be reduced to 27 minutes. Two of the wagons produced in Spain were taken from more trucks and the giant cranes were installed.

Recent Posts

Recent Comments

    fatma Written by:

    Fatma Şahin fatmasahin@istanbulinvestments.com

    Be First to Comment

    Leave a Reply

    Your email address will not be published. Required fields are marked *